I 24 WB over TR 42 & L SALINE R

1.7 MI SE I-57 · County 087, Illinois · Built 1972 · 2 Lanes · 10,350 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
044003000000000
Year Built
1972
Length
213.4 m (700.1 ft)
Max Span
58.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
10,350
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.