I- 80 EB over HOUBOLT RD

1.5 M E OF I-55 · County 197, Illinois · Built 1993 · 2 Lanes · 19,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
099030100000000
Year Built
1993
Reconstructed
2025
Length
45.3 m (148.6 ft)
Max Span
44.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
19,350
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,034,000
Total Project Cost
$1,551,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.