I- 80 WB over I- 55

4 M E GRUNDY CO LIN · County 197, Illinois · Built 1960 · 3 Lanes · 20,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
099004500000000
Year Built
1960
Reconstructed
1993
Length
72.9 m (239.2 ft)
Max Span
22.5 m
Width
15.6 m (51.2 ft)
Lanes
3
Daily Traffic
20,400
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$871,000
Total Project Cost
$1,307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.