US 30 over LINCOLN ST/DAKIN RD

.5 MI W ILL 84 · County 195, Illinois · Built 1955 · 2 Lanes · 9,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
098600000000000
Year Built
1955
Reconstructed
2006
Length
62.7 m (205.7 ft)
Max Span
16.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
9,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$848,000
Total Project Cost
$1,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.