US 30 over SUNFISH SLOUGH

0.7 MI. W. OF IL 84 · County 195, Illinois · Built 1999 · 2 Lanes · 9,650 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
098010600000000
Year Built
1999
Length
134.1 m (440 ft)
Max Span
25.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
9,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.