CH 18 over SEWER CREEK OVERFLOW

NORTH OF NOLTINGS · County 189, Illinois · Built 1994 · 2 Lanes · 375 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
095322900000000
Year Built
1994
Length
15.7 m (51.5 ft)
Max Span
14.9 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
375
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.