CH 18 over BR GRAND POINT CREEK
1 MI SOUTH NOLTINGS · County 189, Illinois · Built 1937 · 2 Lanes · 350 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.472958, -89.204742
This bridge is in worse condition than 80.3% of bridges in County 189. The average bridge in Illinois is 0 years old; this one is 89 years old.
Nearby Bridges
TR 15 over BR OF GRAND POINT CK
Built 1987
TR 15 over BR OF GRAND POINT CK
Built 1984
TR 13 over GRAND POINT CREEK
Built 1984
CH 18 over WEBSTER CREEK
Built 1992
CH 18 over WEBSTER CK OVERFLOW
Built 1994
TR 35 over BR GRAND POINT CR
Built 1918
TR 250 over BR GRAND PT CREEK
Built 1988
CH 18 over SEWER CREEK
Built 1992
CH 18 over SEWER CREEK OVERFLOW
Built 1994
TR 0001 over GRAND POINT CREEK
Built 1978
Bridge Details
- Structure #
- 095301300000000
- Year Built
- 1937
- Reconstructed
- 1973
- Length
- 12.2 m (40 ft)
- Max Span
- 10.7 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.