I-55 (SB) over LAKE SPRINGFIELD

3M S I-72 · County 167, Illinois · Built 2001 · 3 Lanes · 21,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
084049900000000
Year Built
2001
Length
220.2 m (722.4 ft)
Max Span
48.2 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
21,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.