NEW CITY RD / CH 4 over I-55/ PALM ROAD
1.8M S LK SPFLD BRDG · County 167, Illinois · Built 1969 · 2 Lanes · 2,900 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.669914, -89.648344
This bridge is in worse condition than 84.5% of bridges in County 167. The average bridge in Illinois is 0 years old; this one is 57 years old.
Nearby Bridges
FAU 7998 CH 40 over LAKE SPRINGFIELD
Built 1987
E LAKE SHORE DR over I-55
Built 1969
PULLIAM RD/TR 355 over I-55
Built 1971
EAST LAKE SHORE DR over LAKE SPFLD SLOUGH
Built 1997
EAST LAKE SHORE DR over ILLINOIS CENTRAL RR
Built 1998
GORDON DRIVE over GRINDSTONE CR
Built 1969
I-55 (NB) over LAKE SPRINGFIELD
Built 2002
I-55 (SB) over LAKE SPRINGFIELD
Built 2001
FAU 8156 over PANTHER CREEK
Built 1985
COVERED BRIDGE RD over SUGAR CR
Built 1983
Bridge Details
- Structure #
- 084008100000000
- Year Built
- 1969
- Length
- 111.5 m (365.8 ft)
- Max Span
- 30.7 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.