ILL 15 WB over ILL 158

S BELLEVILLE · County 163, Illinois · Built 1958 · 2 Lanes · 21,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
082004300000000
Year Built
1958
Reconstructed
1988
Length
58.8 m (192.9 ft)
Max Span
22.6 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
21,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.