SOUTH THIRD STREET over RICHLAND CREEK

0.10 N CLEVELAND · County 163, Illinois · Built 1921 · 2 Lanes · 550 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
082610800000000
Year Built
1921
Length
13.4 m (44 ft)
Max Span
13.1 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
550
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$69,000
Total Project Cost
$76,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.