CH 19 over COPPERAS CREEK

3 MI SW TAYLOR RIDGE · County 161, Illinois · Built 1950 · 2 Lanes · 1,750 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
081500500000000
Year Built
1950
Length
8.1 m (26.6 ft)
Max Span
3.9 m
Lanes
2
Daily Traffic
1,750
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.