FAS 1201 (CH 9) over COPPERAS CREEK

2.1 MI S EDGINGTON · County 161, Illinois · Built 2022 · 2 Lanes · 375 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
081313100000000
Year Built
2022
Length
35.8 m (117.5 ft)
Max Span
13.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
375
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.