CH 12 over STREAM
3.4 MI SE CERO GORDO · County 147, Illinois · Built 1939 · 2 Lanes · 175 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.850481, -88.692986
This bridge is in worse condition than 61.4% of bridges in County 147. The average bridge in Illinois is 0 years old; this one is 87 years old.
Nearby Bridges
TR 14 over DRAINAGE DITCH
Built 1993
CH 12 over STREAM
Built 1939
TR 14 over DRAINAGE DITCH
Built 1993
TR 173 over STREAM
Built 1967
TR 195 over STREAM
Built 1963
TR 197 over STREAM
Built 1985
TR 169 over STREAM
Built 1971
TR 14 over STREAM
Built 2000
TR 185 over DRAINAGE DITCH
Built 1980
TR 173 over STREAM
Built 1974
Bridge Details
- Structure #
- 074315300000000
- Year Built
- 1939
- Length
- 6.9 m (22.6 ft)
- Max Span
- 3.3 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 175
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.