TR 169 over STREAM
2 MI SSE CERRO GORDO · County 147, Illinois · Built 1971 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.879672, -88.693536
This bridge is in worse condition than 61.4% of bridges in County 147. The average bridge in Illinois is 0 years old; this one is 55 years old.
Nearby Bridges
TR 173 over STREAM
Built 1967
TR 14 over DRAINAGE DITCH
Built 1993
CH 12 over STREAM
Built 1939
CH 12 over STREAM
Built 1939
TR 14 over DRAINAGE DITCH
Built 1993
CH 22(FAS541) over DRAINAGE DITCH
Built 1982
FAS 541(CH 22) over DRAINAGE DITCH
Built 1993
TR 173 over STREAM
Built 1974
FAS 541(CH 22) over DRAINAGE DITCH #3
Built 1994
TR 169 over STREAM
Built 1961
Bridge Details
- Structure #
- 074314800000000
- Year Built
- 1971
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.6 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.