PERRY STREET over I-74

PERRY ST IN PEORIA · County 143, Illinois · Built 2005 · 3 Lanes · 4,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
072018500000000
Year Built
2005
Length
44.4 m (145.7 ft)
Max Span
22.3 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
4,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.