EB I-74 RP F-2 over GLEN OAK AVE

.75 MI W ILLINOIS R · County 143, Illinois · Built 2006 · 5 Lanes · 35,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
072017700000000
Year Built
2006
Length
26.3 m (86.3 ft)
Max Span
23.3 m
Width
21.6 m (70.9 ft)
Lanes
5
Daily Traffic
35,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.