CH 1 (FAS 049) over BRANCH OF MILL CREEK

3.5 MI NE LEAF RIVER · County 141, Illinois · Built 2022 · 2 Lanes · 850 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
071513300000000
Year Built
2022
Length
8.7 m (28.5 ft)
Max Span
3 m
Lanes
2
Daily Traffic
850
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.