EGAN RD. over MILL CREEK

5.0 N.W. BYRON · County 141, Illinois · Built 1962 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
071306000000000
Year Built
1962
Length
18.3 m (60 ft)
Max Span
17.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
50
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.