BAILEYVILLE ROAD over BR. LEAF RIVER

1.5 MI N FORRESTON · County 141, Illinois · Built 1989 · 2 Lanes · 1,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
071329200000000
Year Built
1989
Length
34.4 m (112.9 ft)
Max Span
13 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.