BAILEYVILLE ROAD over LEAF RIVER

2.0 MI N FORRESTON · County 141, Illinois · Built 1983 · 2 Lanes · 1,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
071326800000000
Year Built
1983
Length
15.5 m (50.9 ft)
Max Span
14.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,400
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.