Ramp to IL 3 SB over PALMER CREEK

0.8 mi S of I-255 · County 133, Illinois · Built 1991 · 1 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
067003600000000
Year Built
1991
Length
21.9 m (71.9 ft)
Max Span
21.1 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
1,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.