IL3NB->255WB Rmp E over 255SB->IL3SB Ramp B

NORTH OF COLUMBIA · County 133, Illinois · Built 1982 · 2 Lanes · 36,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
067002900000000
Year Built
1982
Length
46.5 m (152.6 ft)
Max Span
46.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
36,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$751,000
Total Project Cost
$826,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.