I 255 NB Ramp D over 255 SB->IL3 SB Rmp B

NORTH OF COLUMBIA · County 133, Illinois · Built 1982 · 3 Lanes · 25,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
067002600000000
Year Built
1982
Length
46.6 m (152.9 ft)
Max Span
46.3 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
25,850
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.