OAK STREET 6900 over FAP-805 (ILL-161)
CENTRALIA · County 121, Illinois · Built 1954 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
38.529192, -89.135342
This bridge is in worse condition than 81.6% of bridges in County 121. The average bridge in Illinois is 0 years old; this one is 72 years old.
Nearby Bridges
IL 161WB (McCord S over 3 streets BNSFRR ATK ICR
Built 1986
BROOKSIDE AV/FAU86 over SEWER CREEK
Built 1977
JOLLIFF BRIDGE RD over TRIB CROOKED CRK
Built 2008
FAU 8592 over JOHNNIE BRANCH
Built 1999
SOUTH PINE ST over FULTON BRANCH
Built 2007
US 51 NB (FAP 322) over FULTON CREEK
Built 1960
TR 251/W. TENTH ST over SEWER CREEK
Built 1970
US 51 SB (FAP 322) over FULTON CREEK
Built 1960
FAU-8613 over FULTON CREEK
Built 1992
IL 161 - FAP 805 over W Trib Raccoon Crk
Built 1930
Bridge Details
- Structure #
- 061600300000000
- Year Built
- 1954
- Length
- 12.8 m (42 ft)
- Max Span
- 11.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $97,000
- Total Project Cost
- $146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.