IL 161WB (McCord S over 3 streets BNSFRR ATK ICR
Centralia · County 121, Illinois · Built 1986 · 3 Lanes · 8,200 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.530228, -89.133931
This bridge is in worse condition than 37.8% of bridges in County 121. The average bridge in Illinois is 0 years old; this one is 40 years old.
Nearby Bridges
OAK STREET 6900 over FAP-805 (ILL-161)
Built 1954
BROOKSIDE AV/FAU86 over SEWER CREEK
Built 1977
FAU 8592 over JOHNNIE BRANCH
Built 1999
JOLLIFF BRIDGE RD over TRIB CROOKED CRK
Built 2008
FAU 8591 over MARTIN BRANCH
Built 1941
IL 161 - FAP 805 over W Trib Raccoon Crk
Built 1930
SOUTH PINE ST over FULTON BRANCH
Built 2007
US 51 NB (FAP 322) over FULTON CREEK
Built 1960
US 51 SB (FAP 322) over FULTON CREEK
Built 1960
TR 251/W. TENTH ST over SEWER CREEK
Built 1970
Bridge Details
- Structure #
- 061007900000000
- Year Built
- 1986
- Length
- 308.2 m (1011.2 ft)
- Max Span
- 35.4 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 3
- Daily Traffic
- 8,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $954,000
- Total Project Cost
- $1,145,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.