ALBY ST/ FAU 8988 over US ROUTE 67
S BELTLINE ALTON · County 119, Illinois · Built 1961 · 4 Lanes · 5,750 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
38.921519, -90.179811
This bridge is in worse condition than 92.7% of bridges in County 119. The average bridge in Illinois is 0 years old; this one is 65 years old.
Nearby Bridges
IL 111 - HOMER ADA over US 67
Built 1958
ELM ST./ FAU 8989 over US ROUTE 67
Built 1946
ALBY RD/ FAU 8988 over COAL BR
Built 1979
Pebble Creek Drive over Black Creek
Built 1991
US 67 over ALBY ST
Built 1990
HUMBERT RD/FAU 899 over BLACK CK
Built 1953
N SEMINARY /FAU 89 over BLACK CREEK
Built 1966
BROWN ST./ FAU 896 over ROCKSPRING CREEK
Built 1955
N RODGERS AV/TR 91 over BLACK CREEK
Built 1969
WENZEL RD MSS 6925 over IL 255 FAP 310
Built 2010
Bridge Details
- Structure #
- 060610300000000
- Year Built
- 1961
- Reconstructed
- 1991
- Length
- 35.1 m (115.2 ft)
- Max Span
- 12.5 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 4
- Daily Traffic
- 5,750
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $966,000
- Total Project Cost
- $1,001,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.