ALBY ST/ FAU 8988 over US ROUTE 67

S BELTLINE ALTON · County 119, Illinois · Built 1961 · 4 Lanes · 5,750 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
060610300000000
Year Built
1961
Reconstructed
1991
Length
35.1 m (115.2 ft)
Max Span
12.5 m
Width
17.1 m (56.1 ft)
Lanes
4
Daily Traffic
5,750
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$966,000
Total Project Cost
$1,001,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.