N SEMINARY /FAU 89 over BLACK CREEK

0.25 N BELTLINE · County 119, Illinois · Built 1966 · 2 Lanes · 5,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
5
Fair
Superstructure
3
Serious
Substructure
6
Satisfactory

Bridge Details

Structure #
060610200000000
Year Built
1966
Reconstructed
1991
Length
23.6 m (77.4 ft)
Max Span
8.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
5,100
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.