FAS 554 CH 32 over Trib. Willow Branch

0.25 E. of Macon · County 115, Illinois · Built 2001 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
058506300000000
Year Built
2001
Length
7.2 m (23.6 ft)
Max Span
3.5 m
Lanes
2
Daily Traffic
1,200
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.