FAP 322 (US 51) over DRY CREEK

.6 MI S OF MACON · County 115, Illinois · Built 2001 · 4 Lanes · 5,700 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
058200800000000
Year Built
2001
Length
8.3 m (27.2 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
5,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.