TR 25 over DRAINAGE DITCH
2 MI N OF OREANA · County 115, Illinois · Built 1985 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 3 | Serious |
Location
39.966128, -88.875106
This bridge is in worse condition than 94.5% of bridges in County 115. The average bridge in Illinois is 0 years old; this one is 41 years old.
Nearby Bridges
TR 216(MIDWAY RD) over KICKAPOO CREEK
Built 1989
TR 11 B over TRIB TO FRIENDS CR
Built 2000
FAS-549A CH-20 over Ditch
Built 2007
TR 150(GREENSWITCH over Spring Creek
Built 1974
CH 20(FAS 549B) over I-72
Built 1975
FAS 544(CH 25) over I-72
Built 1975
I-72 over STREAM
Built 1975
FAU 7464 (IL 48) over STREAM
Built 2013
TR 11 B over KICKAPOO CREEK
Built 1998
TR 45(KIRBY RD) over I-72
Built 1975
Bridge Details
- Structure #
- 058335000000000
- Year Built
- 1985
- Length
- 8.8 m (28.9 ft)
- Max Span
- 7.9 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.