FAS-549A CH-20 over Ditch

2 MI W OREANA · County 115, Illinois · Built 2007 · 2 Lanes · 1,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
058337700000000
Year Built
2007
Length
21.2 m (69.6 ft)
Max Span
20 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,350
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.