FAS 351 CH 1 over HENLINE DITCH

1.5 MI S CROPSEY · County 113, Illinois · Built 1990 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
057380900000000
Year Built
1990
Length
25.2 m (82.7 ft)
Max Span
9.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.