TR10A SULLIVANT over MACKINAW RIVER

1180N 200E · County 053, Illinois · Built 1976 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
027324200000000
Year Built
1976
Length
15.8 m (51.8 ft)
Max Span
15.5 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.