I-55/I-74 NB over WASH.ST/FAU 6360/CnsTrai

0.4 MI S ILL RT 9 · County 113, Illinois · Built 1962 · 3 Lanes · 21,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
057001600000000
Year Built
1962
Reconstructed
2001
Length
55.9 m (183.4 ft)
Max Span
21 m
Width
22 m (72.2 ft)
Lanes
3
Daily Traffic
21,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,040,000
Total Project Cost
$1,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.