I-55/I-74 NB over SUGAR CREEK

1.0 MI SO I55 &ILL 9 · County 113, Illinois · Built 1963 · 3 Lanes · 21,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
057001100000000
Year Built
1963
Reconstructed
2001
Length
86.5 m (283.8 ft)
Max Span
34.7 m
Width
20 m (65.6 ft)
Lanes
3
Daily Traffic
21,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.