HILLTOP DRIVE over WOODS CREEK
.2M.N.HUNT.ALGQN.RD. · County 111, Illinois · Built 1985 · 2 Lanes · 1,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.178942, -88.316731
This bridge is in worse condition than 27.8% of bridges in County 111. The average bridge in Illinois is 0 years old; this one is 41 years old.
Nearby Bridges
ALGONQUIN ROAD over WOODS CREEK
Built 2004
Jessie Road over Crystal Creek
Built 2014
ALGONQUIN ROAD over CRYSTAL CREEK
Built 2004
OAK STREET over CRYSTAL CR
Built 1993
CRYSTAL LAKE RD over WOODS CREEK
Built 2006
ALGONQUIN ROAD over GRAVEL PIT CREEK
Built 2004
RANDALL ROAD over WOODS CREEK
Built 1969
IL 31 over ALGONQUIN RD
Built 2013
IL 31 SB ENT RAMP over CRYSTAL CREEK
Built 2013
IL 31 over CRYSTAL CREEK
Built 2013
Bridge Details
- Structure #
- 056640200000000
- Year Built
- 1985
- Length
- 17.1 m (56.1 ft)
- Max Span
- 17.1 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.