ALGONQUIN ROAD over GRAVEL PIT CREEK
.2M SE OF PYOTT · County 111, Illinois · Built 2004 · 5 Lanes · 31,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
42.173536, -88.303475
This bridge is in worse condition than 66.5% of bridges in County 111. The average bridge in Illinois is 0 years old; this one is 22 years old.
Nearby Bridges
ALGONQUIN ROAD over CRYSTAL CREEK
Built 2004
Jessie Road over Crystal Creek
Built 2014
IL 31 over ALGONQUIN RD
Built 2013
IL 31 SB ENT RAMP over CRYSTAL CREEK
Built 2013
IL 31 over CRYSTAL CREEK
Built 2013
ALGONQUIN ROAD over WOODS CREEK
Built 2004
IL 31 NB EXIT RAM over CRYSTAL CREEK
Built 2013
Main Street over Crystal Lake Overflo
Built 2020
HILLTOP DRIVE over WOODS CREEK
Built 1985
S. Harrison Street over Crystal Lake Overflo
Built 2023
Bridge Details
- Structure #
- 056316600000000
- Year Built
- 2004
- Length
- 12.3 m (40.4 ft)
- Max Span
- 11.1 m
- Width
- 19.8 m (65 ft)
- Lanes
- 5
- Daily Traffic
- 31,600
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.