CH 9/FAS 309 over CANAVAN CREEK

4.9 MI E OF IL 50 · County 091, Illinois · Built 1988 · 2 Lanes · 1,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
046347600000000
Year Built
1988
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
1,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.