TR 21 over CANAVAN SLOUGH

2 MI SW WHITAKER · County 091, Illinois · Built 1982 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
046343300000000
Year Built
1982
Length
15.5 m (50.9 ft)
Max Span
14.9 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.