TR 187 over LITTLE PIASA CK
1.2 M SW NEW DELHI · County 083, Illinois · Built 1972 · 2 Lanes · 500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
3
Serious
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 3 | Serious |
| Substructure | 6 | Satisfactory |
Location
39.015356, -90.269978
This bridge is in worse condition than 98.2% of bridges in County 083. The average bridge in Illinois is 0 years old; this one is 54 years old.
Nearby Bridges
TR 150C over BRANCH LITTLE PIASA
Built 1975
CH 61 AIRPORT RD over TRIB LITTLE PIASA
Built 2010
TR 136 over TRIB TO PIASA CREEK
Built 2011
US 67 NB over PIASA CREEK
Built 2012
US 67 SB over PIASA CREEK
Built 2012
CH 5 over STREAM
Built 1925
MCCLUSKY RD FAS 74 over TRIB OF LITTLE PIASA
Built 2008
CH61/AIRPORT ROAD over PIASA CREEK
Built 1958
CH61/AIRPORT ROAD over LITTLE PIASA CREEK
Built 1958
FAS 748 over LITTLE PIASA CREEK
Built 1901
Bridge Details
- Structure #
- 042308500000000
- Year Built
- 1972
- Length
- 24.9 m (81.7 ft)
- Max Span
- 8.9 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete
- Design
- Channel Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $86,000
- Total Project Cost
- $95,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.