US 67 SB over PIASA CREEK

7.6 MI S JERSEYVILLE · County 083, Illinois · Built 2012 · 2 Lanes · 12,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
042002600000000
Year Built
2012
Length
68.8 m (225.7 ft)
Max Span
27.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
12,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.