TR 140 over LANGAN CR

2.32 MI S CHEBANSE · County 075, Illinois · Built 1980 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
038364300000000
Year Built
1980
Length
32.6 m (107 ft)
Max Span
11 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.