CH 29 over I-57

3.0 M S OF CHEB INTR · County 075, Illinois · Built 1965 · 2 Lanes · 800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
038008800000000
Year Built
1965
Length
63.1 m (207 ft)
Max Span
17.8 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.