TR 32 PEACH ORCHAR over STREAM

1160N 900E · County 053, Illinois · Built 2005 · 2 Lanes · 225 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
027343300000000
Year Built
2005
Length
17.6 m (57.7 ft)
Max Span
16.1 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
225
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.