CH 3 MELVIN SIBLEY over THE BIG FOUR

950E 1200N · County 053, Illinois · Built 1981 · 2 Lanes · 625 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
027333400000000
Year Built
1981
Length
24.4 m (80.1 ft)
Max Span
7.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
625
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.