FAS 716/ CH4 over RIB SUGAR CREEK

0.3 MI N ST. ELMO · County 051, Illinois · Built 2002 · 2 Lanes · 1,050 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
026341400000000
Year Built
2002
Length
19.3 m (63.3 ft)
Max Span
18.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
1,050
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.