FAS 2796 (US-40) over BRICKYARD BR

WCL ST ELMO · County 051, Illinois · Built 1951 · 2 Lanes · 2,450 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
026200600000000
Year Built
1951
Length
8.8 m (28.9 ft)
Max Span
2.7 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
2,450
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$138,000
Total Project Cost
$161,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.