IL 38 WB over IL 38 EB RAMP

2.4 M W OF US 45 · County 043, Illinois · Built 1952 · 2 Lanes · 47,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
022005800000000
Year Built
1952
Reconstructed
1992
Length
121.8 m (399.6 ft)
Max Span
55.8 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
47,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,860,000
Total Project Cost
$2,790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.