NB I-294 over Ramp A(IL38 to I-290

0.2 M N IL 38 · County 031, Illinois · Built 2023 · 6 Lanes · 68,550 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
016964800000000
Year Built
2023
Length
57.3 m (188 ft)
Max Span
52 m
Width
33 m (108.3 ft)
Lanes
6
Daily Traffic
68,550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.